top of page

Monolithic Pour Footing and Slab Combo

This large-scale project involved the successful execution of a Monolithic Pour Footing and Slab Combo foundation, a highly efficient method for creating a robust and integrated structural base. Situated in a scenic, rural area of Vancouver with the mountains providing a backdrop, the sheer size of this pour required precise planning and skilled coordination by the SMV Concrete team.


The delivered foundation is a superior, high-performance structural base, ready for vertical construction. It stands as a testament to SMV Concrete’s technical proficiency in large, complex foundation systems.

Location

Vancouver, WA

Completed

2025

Project Type

Slab

Concrete Style

Project Details

  • Integrated Strength: A monolithic pour ensures that the footing (which bears the load) and the slab (the floor) are poured as a single, continuous unit. This eliminates cold joints, providing maximum structural integrity and stability, essential for large residential or commercial structures.


  • Large-Scale Logistics: The significant volume of concrete required for this large foundation pour demonstrated SMV Concrete's capability to manage complex logistics, coordinate multiple concrete deliveries, and execute a continuous pour on a tight schedule.

  • Ground Preparation: The success of a monolithic pour depends heavily on accurate grading, form-setting, and rebar placement. The finished, uniform surface showcases the meticulous preparation work performed by the crew.

  • Location Challenges: Working in a rural setting, often with varied terrain, requires specialized equipment and attention to detail, proving SMV Concrete’s versatility across the greater Vancouver, WA area.

Explore More Concrete Projects

bottom of page